Numac  
Power Stations And Repairing
 
 
 
 
 
"Manufacturing, Reconditioning, Dynamic Balancing, Metallizing Facility"
 
 
 

Rebuilding and Reconditioning

 

• P.A. Fan, I.D. Fan, F.D. Fan impellers and shaft, Motor Rotor Shafts.
 
• Heavy duty roller Shaft, klin Support rollers.
 
• Crane wheels, Loco wheels.
 
• Bearing Housing  of sheet Milling mills.
 
• Rotor Crusher shaft ( Rebuilding ).
 
• Valve - H.P. Control, Feed control, Spray Control.

• BFP Motor Rotor.

 
REPAIRS TO W.C.L. (CHP)
INTER-STAGE SEALING STRIP
REPAIRS TO W.C.L. (CHP)
CRUSHER ROTOR 2005-06
INTER-STAGE SEALING STRIP
MANUFACTURING & FITTING WORK
SIEMENS SET
HP / IP INNER CASING SEALING STRIP REPLACEMENT WORK, READY FOR DESPATCH
STELLITING GRINDING BLUE MATCHING OF DRAIN VALVE 500 MW N.T.P.C. SINGRAULI
HP / IP INNER CASING SEALING STRIP REPLACEMENT WORK, READY FOR DESPATCH
STELLITING GRINDING BLUE MATCHING OF DRAIN VALVE 500 MW N.T.P.C. SINGRAULI 2005-06
APRON FEEDER SHAFT COUPLING
MANUFACTURING OF
APRON FEEDER SHAFT COUPLING
& HUB REPLACEMENT WORK, C.H.P. KORADI 2005-06
MANUFACTURING OF
H.P. GLAND LABYRINTHS OF GE / POLISH / BHEL MAKE TURBINES