|
|
|
|
Spider Ring-Machining |
Balancing of Turbine Rotor |
|
|
|
T Slot Machining |
Spider Ring Machining |
|
|
Silver Coating of Retainer Ring of Generator |
Coating |
|
|
|
HP Casing |
Balancing of PA Fan Impelle |
|
|
|
Balancing of ID Fan |
CRM Mandrel |
|
|
ID Fan |
Turbine Casing Face Machining |
|
|
|
|
Parting of Operation |
Worm Wheel Hub |
|
|
Parting of Operation |
IP Casting |
|
|
|
SPM For Insitu Machining Of Rotary Air Heater Shaft |
|
|
|
Inter-stage Sealing Strip Manufacturing and Fitting of
Sealing Strip for Siemens set 62.5 MW of Turbine casing |
Inter-stage Sealing Strip Manufacturing and Fitting of
Sealing Strip for KWU set 210 MW of Turbine casing |
|
|
|
Gripping Sheave With Gear For Rope Way
|
The blade holding base area was machined to match with the hub
|
|
|
Dynamic Balancing of 120 MW I.P. Rotor13 MT |
Axial ID Fan Repair & Dynamic Balancing |
|
| |